The 3.5 MeV electron accelerator of ATRON Metrology has arrived on-site.
After several months of construction of the building intended to welcome it to Cherbourg-en-Cotentin, and after obtaining all the necessary NSA authorizations:
The 3.5 MeV electron accelerator of ATRON Metrology has arrived on-site!
Five engineers are now working on the installation of the beam line to allow us to carry out the first treatments and qualifications of materials under irradiation, as soon as possible.
This installation will allow us to best meet your needs, current and future, in terms of irradiation, including calibration of radiation survey meters, treatment and qualification of materials.